On Monday morning September 19 at 9:00 a.m., crews will begin repair work on a 30-inch waterline along N. Pearson Lane near Southlake Blvd.
Southlake Public Work crews, working with Circle C Construction, will excavate the site to determine the cause of the 30-inch waterline break.
During repairs, N. Pearson Lane will remain open to traffic; however, motorists traveling northbound will be diverted onto a temporary gravel lane during the duration of the repairs. Southbound traffic will continue on the paved road.
The repair work will take place from 9:00 a.m. to 5:00 p.m. each day until repairs are completed. The City will have a better idea how long the repairs will take once they reach the break in the waterline.
Motorists are asked to drive with caution and observe construction zone signs.