A white shield outlined in gold features a large, stylized black letter "S" in the center.
Logo with the text “MY SOUTHLAKE NEWS” in bold, uppercase letters, with horizontal gold lines on each side of the word “SOUTHLAKE.”.
A simple, empty gold-outlined shield shape with a white interior, shown on a plain background.
A white rectangle with thin, horizontal, light brown lines near the left and right edges, each pair of lines closely spaced and parallel. The center of the image is blank.
An orange barrel with a logo appears on the left against a brown background with faint map lines. Text reads, "Orange Barrel Alerts Starting January 2, 2023." The "Connect Southlake" logo is below.
|
Dec 27, 2022

Orange Barrel Alerts Starting January 2, 2023

It's essential to be in the know about road alerts and construction projects happening around town. Below is a list of upcoming projects: SIDEWALK REPAIRS Apex Concrete will repair settled and cracked sidewalks along the 300 and 400 blocks of Grand Avenue starting January 2, 2023, weather permitting. Work will take place from 7:00 a.m.…

It’s essential to be in the know about road alerts and construction projects happening around town. Below is a list of upcoming projects:

SIDEWALK REPAIRS

Map highlighting an "Orange Barrel Alert" for concrete sidewalk repairs starting January 2 on the 400 block of West Grand Ave. The map shows nearby streets: Prospect Street, State Street, Grand Avenue, Civic Place, and Main Street.

Apex Concrete will repair settled and cracked sidewalks along the 300 and 400 blocks of Grand Avenue starting January 2, 2023, weather permitting. Work will take place from 7:00 a.m. to 5:30 p.m., with some night work taking place along the 200 block of Grand Avenue. Traffic will remain open. Work will continue until completion.

ROAD IMPROVEMENTS

Map showing road improvements in Dove Estates area. Roads affected include Lake Drive, Lakeside Drive, Peninsula Drive, Peninsula Court, and Flamingo Circle. Work starts January 3. Orange barrel graphic and compass rose on the map.

Construction workers will begin road improvements on Lake Drive, Peninsula Drive, Lakeside Drive, Peninsula Court, and Flamingo Court in the Dove Estates Subdivision starting January 3, 2023, weather permitting. Construction work will take place from 7:00 a.m. to 5:30 p.m. One lane of traffic will remain open. Please be patient while our crews work.

Don’t hesitate to contact Public Works at (817) 748-8082 with any questions.

Share

Banner promoting annual Stars & Stripes event. Event is July 3, 5–11 PM, with fireworks at 9:30 PM at Southlake Town Square. SouthlakeStarsAndStripes.com.