A white shield outlined in gold features a large, stylized black letter "S" in the center.
Logo with the text “MY SOUTHLAKE NEWS” in bold, uppercase letters, with horizontal gold lines on each side of the word “SOUTHLAKE.”.
A simple, empty gold-outlined shield shape with a white interior, shown on a plain background.
A white rectangle with thin, horizontal, light brown lines near the left and right edges, each pair of lines closely spaced and parallel. The center of the image is blank.
|
Apr 28, 2023

Orange Barrel Alerts Starting May 1, 2023

Over the next few weeks, several projects will be taking place that could affect your daily commute. Here’s what’s going on and how it might impact your travels. S. White Chapel Boulevard Asphalt Repair Public Works Streets Division will conduct an asphalt repair north of the Continental Boulevard and S. White Chapel roundabout from Monday,…

Over the next few weeks, several projects will be taking place that could affect your daily commute. Here’s what’s going on and how it might impact your travels.

A traffic alert graphic with text: "Orange Barrel Alert. Asphalt Repair. May 1-2, 9:00 am - 4:00 pm on 1100 S. White Chapel Blvd." Features a map with highlighted road areas and a compass rose icon.

S. White Chapel Boulevard Asphalt Repair
Public Works Streets Division will conduct an asphalt repair north of the Continental Boulevard and S. White Chapel roundabout from Monday, May 1, to Tuesday, May 2, from 8 a.m. to 4 p.m., weather permitting. Flaggers will be present during the project.

Map indicating road work on Shady Oaks Dr with an "Orange Barrel Alert" on the left. Water improvements scheduled for May 1-5 from 7:00 am to 5:00 pm are noted. Streets like TX 114, Northwest Parkway, and North White Chapel Boulevard are visible.

Shady Oaks Drive – Water Improvements
Contractors will be on-site to perform vacuum excavation services along Shady Oaks Drive, from West Highland to Fox Glen, starting Monday, May 1, through Friday, May 5, from 7 a.m. – 5 p.m., weather permitting. This work is in anticipation of the upcoming Capital Improvement Project for waterline improvements along Shady Oaks starting in spring 2023. Shoulder work will occur during this time and should not disrupt traffic along Shady Oaks.

A map showing the location of concrete road repair on Forest Hills Ct from May 1-12, 7:00 am-5:00 pm. Includes nearby streets and Texas Health Harris Methodist Hospital. Banner on the left reads "Orange Barrel Alert.

Forest Hills Court Concrete Road Repair
Contractors will be on-site at the 1300 block of Forest Hills Court to repair concrete starting May 1 through May 12, from 7 a.m. – 5 p.m., weather permitting. One lane of traffic will remain open throughout the project.

Share