A white shield outlined in gold features a large, stylized black letter "S" in the center.
Logo with the text “MY SOUTHLAKE NEWS” in bold, uppercase letters, with horizontal gold lines on each side of the word “SOUTHLAKE.”.
A simple, empty gold-outlined shield shape with a white interior, shown on a plain background.
A white rectangle with thin, horizontal, light brown lines near the left and right edges, each pair of lines closely spaced and parallel. The center of the image is blank.

Latest OBA News

Map showing a section of West Continental Boulevard with a highlighted work area marked in orange between Davis Boulevard and Village Green Drive. Nearby streets include Woodbury Court, Amesbury Court, Deer Hollow Boulevard, and Weeping Willow Way. Koalaty Park and Carroll Elementary School are visible to the southeast. The highlighted segment indicates the location of planned telecommunications line relocation.
Feb 6, 2026

Hunt Communications Relocation Project

Beginning Monday, February 9, 2026
A map shows an intersection of Hampden-Sydney Road and Hampden Tavern Way, marked with an orange location pin. Several nearby buildings and roads are also visible.
Feb 4, 2026

N. Peytonville Avenue Water Main Repair

Beginning Thursday, February 5, 2026
Map view of Park Village shopping area in Southlake, Texas, showing building layouts, parking lots, roads, and surrounding streets including East Southlake Boulevard and Kimball Avenue. Key locations and shop names are labeled.
Jan 16, 2026

Restriping work on Zena Rucker and Tower

Beginning January 20, 2026
A map showing the intersection of West Dove Road and TX 114. There are nearby buildings, ponds, green areas, and roads, including an overpass and on/off ramps connecting West Dove Road to TX 114.
Jan 8, 2026

OBA Alert – Leak Repair on Shady Oaks

Begins January 12, 2025
A digital map showing Brook Drive intersecting with FM 1709. An orange location marker pinpoints a spot on Brook Drive. Nearby roads include Sunny Brook Vista and Park Grove Lane. Buildings and property outlines are visible.
Sep 24, 2025

Asphalt Improvements along Brock Drive

Begins October 6, 2025
A detailed street map shows neighborhoods with labeled roads, houses, water features, and a compass rose in the lower right corner, highlighting Dove Road, FM 1938, and surrounding residential streets.
Sep 23, 2025

Randol Mill Avenue CIP Project

Construction begins October 6, 2025
A suburban neighborhood map showing winding roads, cul-de-sacs, individual houses, and green areas. Streets include Randall Mill Ave, Sleepy Hollow Rd, and Woodward Way. A stream runs along the right side of the map.
Sep 19, 2025

Morgan Road Utility Investigations

Begins the week of September 22, 2025
A map showing the intersection of Clyde Boulevard (FM 1938), Union Church Road, and West Continental Boulevard, with surrounding buildings and roads labeled. An orange map pin marks the intersection on Clyde Boulevard.
Sep 12, 2025

Preliminary Utility Work Begins on Union Church Road

Starting September 15, 2025
Map showing East Highland Street intersecting with several small roads. A location pin marks a spot slightly north of East Highland Street, near residential areas and a large school complex to the southwest.
Apr 24, 2025

Upcoming Asphalt Repairs on Highland Street

Please see the information below regarding upcoming asphalt repairs on Highland Street.