A white shield outlined in gold features a large, stylized black letter "S" in the center.
Logo with the text “MY SOUTHLAKE NEWS” in bold, uppercase letters, with horizontal gold lines on each side of the word “SOUTHLAKE.”.
A simple, empty gold-outlined shield shape with a white interior, shown on a plain background.
A white rectangle with thin, horizontal, light brown lines near the left and right edges, each pair of lines closely spaced and parallel. The center of the image is blank.
A quiet, empty road curves slightly, bordered by grass and trees on a sunny day with a blue sky and scattered clouds. A row of white buildings with fences is visible on the left side of the road.
|
Aug 12, 2025

Upcoming Asphalt Repair on S White Chapel Boulevard

Please see the information below regarding upcoming roadwork.

Weather permitting, the City Streets Crew will be repairing asphalt on the 300 block of S. White Chapel Blvd. on August 14, 2025. The work is expected to take one day and will occur between 9:00 a.m. and 3:00 p.m. Traffic control and flaggers will be in place to guide drivers safely through the area. Thank you for your patience while we complete this project!

Share

A circular logo for the City of Southlake’s 70th anniversary (1956–2026) is on the left, next to an under-construction brick building with scaffolding and a crane on the right.