A white shield outlined in gold features a large, stylized black letter "S" in the center.
Logo with the text “MY SOUTHLAKE NEWS” in bold, uppercase letters, with horizontal gold lines on each side of the word “SOUTHLAKE.”.
A simple, empty gold-outlined shield shape with a white interior, shown on a plain background.
A white rectangle with thin, horizontal, light brown lines near the left and right edges, each pair of lines closely spaced and parallel. The center of the image is blank.
Orange Barrel Alerts Starting July 5, 2023
|
Jul 5, 2023

Orange Barrel Alerts Starting July 5, 2023

Here's a look at upcoming mobility work that could affect your commutes.  Wayfinding Pole Foundation Work  City contractors will begin repair work on wayfinding pole foundations starting Wednesday, July 5, 2023, weather permitting. Work will occur on FM 1709 at Gateway Drive and East SH 114 at Kimball Ave. July 5, 2023 - City contractors…

Here’s a look at upcoming mobility work that could affect your commutes. 

Wayfinding Pole Foundation Work 

City contractors will begin repair work on wayfinding pole foundations starting Wednesday, July 5, 2023, weather permitting. Work will occur on FM 1709 at Gateway Drive and East SH 114 at Kimball Ave.

July 5, 2023 – City contractors will remove the wayfinding sign on westbound FM 1709 at Gateway Drive, weather permitting. Expect a lane closure in the far right lane of the westbound direction.

Map showing road construction alert for wayfinding pole removal on Westbound FM1709 at Gateway Dr., starting July 5. Orange Barrel Alert logo on the left and map details on the right, highlighting the affected area.

July 10-12, 2023 – City contractors will drill and pour the concrete foundations for the wayfinding signs on westbound FM 1709 at Gateway Drive and eastbound SH 114 at Kimball Avenue. The right traffic lane at each location will be closed while crews work. 

Map showing road alerts for wayfinding pole repair with concrete foundations in Southlake. Work occurs on Westbound FM1709 at Gateway Dr. from July 10-12, noted in an "Orange Barrel ALERT." Streets like East Southlake Boulevard are marked.

July 25-26, 2023 – City contractors will re-install the wayfinding signs on westbound FM 1709 at Gateway Drive and eastbound SH 114 at Kimball Avenue. The right traffic lane at each location will be closed while crews work.

A map alert notice titled "Orange Barrel Alert" about wayfinding pole reinstallation. Scheduled for July 25-26 on Westbound FM 1709 at Gateway Dr. The map highlights the area with street names like East Southlake Boulevard and Gateway Drive.

 

Road Reconstruction Project on Shady Oaks Road

City contractors will perform road reconstruction at Shady Oaks in front of the Marq starting Monday, July 10, 2023, through Friday, July 26, 2023, from 7:00 a.m. to 5:00 p.m. daily, weather permitting. We anticipate periodic closures of both Shady Oaks entrances to Champions Club at the Marq. Motorists should enter Bicentennial Park off of Southlake Boulevard or at Unity Way to get to Champions Club. We thank you for your patience.

Map showing a road reconstruction alert for July 10-26, 7:00 am to 5:00 pm on Shady Oaks. Left side features an "Orange Barrel Alert" graphic with road cone.右側にはランドマークや駐車場が表示された地図が描かれている。.

Share

Banner promoting annual Stars & Stripes event. Event is July 3, 5–11 PM, with fireworks at 9:30 PM at Southlake Town Square. SouthlakeStarsAndStripes.com.